logo
Latest company case about

Solutions Details

Created with Pixso. Home Created with Pixso. Solutions Created with Pixso.

Conventional electric heating equipment wiring steps

Conventional electric heating equipment wiring steps

2024-11-25

1. Open the movable door panel and put the removed door panel in place;
2. Open the electrical box door and confirm that the circuit breaker is in the power-off state;
3. Connect the reserved power line and the leakage circuit breaker in sequence and ensure that they are secure,4. Connect the grounding wire to the grounding pile, and its length must be more than twice the length of other wires;,5. Power the line and press the test button of the circuit breaker; ensure that the circuit breaker can work normally,6. After the circuit breaker is reset, press the power button on the control panel;
7. Press the fan button on the control panel to test the fan and ensure that the fan is tumning correctly;8. After the fan is running normally, test the heating and purification functions in turn;9. After the test is completed, close the electrical box cover and the movable door panel in tumn.

banner
Solutions Details
Created with Pixso. Home Created with Pixso. Solutions Created with Pixso.

Conventional electric heating equipment wiring steps

Conventional electric heating equipment wiring steps

1. Open the movable door panel and put the removed door panel in place;
2. Open the electrical box door and confirm that the circuit breaker is in the power-off state;
3. Connect the reserved power line and the leakage circuit breaker in sequence and ensure that they are secure,4. Connect the grounding wire to the grounding pile, and its length must be more than twice the length of other wires;,5. Power the line and press the test button of the circuit breaker; ensure that the circuit breaker can work normally,6. After the circuit breaker is reset, press the power button on the control panel;
7. Press the fan button on the control panel to test the fan and ensure that the fan is tumning correctly;8. After the fan is running normally, test the heating and purification functions in turn;9. After the test is completed, close the electrical box cover and the movable door panel in tumn.