1. Turn on the main powerr switch
2. Turn on the power switch, fan switch, fume purifier switch, and heating switch on the "Teppanyaki" in sequence.
3. PV displays the current temperature, SV displays the set temperature, and the green light displays heating.
4. Press the up arrow to increase the temperature value, and press the down arrow to decrease the temperature value.
5.SET sets the parameters (set before leaving the factory).
6. The optimal operating temperature of Teppanyaki is 250°C
7.To turn of the "teppanyaki", tum of the "heating" switch first,then turn of the fan switch and fume purifier switch in sequence,and then tum of the power switch after1 minute.
Precautions:
1. Do not use jet water for cleaning;if the power cord is damaged,it must be replaced by profesionals from the manufacturer,its maintenance department or simlardepartments to avoid danger.
2, Users with pacemakers should consult with the manufacturer before operating the device, Other "precautions" and "Warings", "same as above'
1. Turn on the main powerr switch
2. Turn on the power switch, fan switch, fume purifier switch, and heating switch on the "Teppanyaki" in sequence.
3. PV displays the current temperature, SV displays the set temperature, and the green light displays heating.
4. Press the up arrow to increase the temperature value, and press the down arrow to decrease the temperature value.
5.SET sets the parameters (set before leaving the factory).
6. The optimal operating temperature of Teppanyaki is 250°C
7.To turn of the "teppanyaki", tum of the "heating" switch first,then turn of the fan switch and fume purifier switch in sequence,and then tum of the power switch after1 minute.
Precautions:
1. Do not use jet water for cleaning;if the power cord is damaged,it must be replaced by profesionals from the manufacturer,its maintenance department or simlardepartments to avoid danger.
2, Users with pacemakers should consult with the manufacturer before operating the device, Other "precautions" and "Warings", "same as above'